


The study identifies transportation requirements as a result of forecasted growth to include specific projects

Port Manatee Site Utilization & Network Analysis Study – The purpose of this study was to research and identify future capability and capacity improvements utilizing current and future Port Manatee properties, existing infrastructure,Īnd identification of new infrastructure and facilities to maximize Port Manatee’s freight movement and handling capabilities. The report provides a review of FAC Connector conditions district-wideĪnd offers more detailed information on conditions of FAC Connectors in FACs with high levels of existing and potential industrial development activity. Transportation and freight logistics along key corridors as part of the District’s ongoing efforts to provide more efficient and safe freight movement in the region. The definition and evaluation process were undertaken to identify issues impacting Roadways connecting freight trip generating uses within FACs with Freight Mobility Corridors (FMCs) designated in the District Freight Mobility and Trade Plan (FMTP). FAC Connectors are defined as local and state Freight Activity Center Definition & Evaluation – The report summarizes methods used to identify and evaluate Freight Activity Center (FAC) Connectors in FDOT District One.
